To Resolve Congestion in Wonokromo Area” Having pulled down the office of Joyoboyo terminal, there was first piling done by the contractor on the old office of 30th Friday. The piling process has been delayed as the redesign relates to the utilities of PDAM in the area. The agenda, held by Dishub and UPTD Joyoboyo terminal, was attended by managing director and chief of Dishub Surabaya, Eddi, A.Md. LLAJ. S.Sos. MM, the head of facility division Ir. Irvan Wahyudrajad, M.MT, the head of UPTD Joyoboyo, Radiyanto and local mass media.

The type-B terminal would be constructed with modern design and be integrated with Surabaya Zoo (KBS). In stage I, there will be terminal office and ITS (Intelligent Transport System), parking management, CCTV and controlling rooms to monitor traffic in southern Surabaya. For further development, there, in DED Joyoboyo, would be built a terminal and parking lot vertically. It is to be expected the terminal capacity would be bigger and reduce traffic congestion in the area. Dishub Surabaya plans to provide under pass (tunnel) which connects KBS to eastern Wonokromo street.

Source : Dinas Perhubungan Pemerintah Kota Surabaya